Health Care

CCG Accomodation

McAndrew Martin have recently completed the design and Specification for the Proposed Internal fit-out to form office accommodation on the First Floor at Central 40, Chineham Business Park, Basingstoke. McAndrew Martin were appointed by the NHS to undertake a design and specification for fitting out the existing open plan first floor plan into new office accommodation for the CCG staff. This included new partitions to form office, conference, kitchen, storage and Secure Server Room Facilities. The works also included the adaptation along with new services to accommodate the new layout including lighting, ventilation, power, data and air conditioning all linked to the main Buildings BMS system.

McAndrew Martin were also instructed to tender the project and manage the project on site working alongside the NHS Project Manager and Business Park Building Manager to ensure all works were undertaken in accordance with the lease and legal agreement. During the construction stage, the end user requested additional works which were undertaken and completed within the original project programme. The  works were completed in February 2013 and the end Project Value was £250,000.00.

Earl Mountbatten Hospice

The Works comprise the complete removal of Engineering Services together with extensive demolitions to water damaged fabric and / or structure; alterations and refurbishment work to Halberry Lodge to provide an essentially Day Care facility.  The principle elements consisted of replacement of Mechanical and Electrical services,  renewal of ridge roof glazing, extensive glazing works to windows, and remodelling works to the main entrances, reconfiguration and remodelling of partitioning and room layouts, renovation and upgrading works to all wall, floor and ceiling finishings, external works adjacent to the refurbished Halberry Lodge comprise associated service diversions and extensions; paths, drainage, pavings, footpaths, soft and hard landscaping, car park and associated retaining wall and the construction of a linking covered walkway between Halberry Lodge and Earl Mountbatten Hospice main building. The Tender return was £1.87 Million and was completed in July 2012 under budget.
 
Southampton General Hospital
McAndrew Martin were appointed by Southampton Universities Hospitals NHS Trust for the remedial works to existing roofing systems by overlaying existing with a Single Ply Roof Membrane, removal/enclosing of adjacent parapet walls/roof mounted services in Steel Frame/Kingspan Cladding with associated existing timber repairs  to ensure a watertight covering and installation of a self-supporting roof edge protection system with associated Mechanical and Electrical Services to the Laboratory and Pathology Building at Southampton General Hospital. The project cost £520,000.00 and was completed in July 2010.